A top political adviser urged the
government to have an emergency plan ready in case of serious water
pollution accidents at the Three Gorges Dam. "Otherwise, if petrochemical plants in
the upper reaches of the Yangtze River have an explosion or leak,
damage around the dam project will be much bigger than that in
northeast China's Songhua River last year," Chen Jingqiu, a member
of the Chinese People's Political Consultative Conference (CPPCC)
National Committee, told China Daily yesterday. Water already flows more slowly as the
construction of the dam draws to a close and will slow down even
more after the dam begins operations, according to Chen, a professor
at Chongqing University in southwest China. With a length of 1,983 meters and a
height of 185 meters, the dam is one of the biggest hydropower
structures in the world and is a key part to developing the Yangtze
River. Construction of the project will reportedly be completed in
May. In fact, water pollution caused by
petrochemical plants at the upper reaches of the Yangtze River has
occurred. Caused by industrial waste water, a
pollution accident happened two years ago along the Tuojiang River,
a branch of the Yangtze, in southwest China's Sichuan Province.
Economic losses totaled 300 million yuan (US$37 million).
Source: China Daily
- CBCSD and Members Participated and Suggested on the Project for Technical Regulation on Low-carbon Pilot Community
- CBCSD and Members Participated in the APEC Cooperation Network Construction Forum of Green Supply Chain
- Calculation Method of CO2 Emissions in Petroleum and Natural Gas Exploitation Enterprises & Calculation Method of CO2 Emissions in Water Network of Chemical Enterprises
- CBCSD Attended the Workshop for Environmental Protection and Sustainable Development and Delivered Introductions
- WBCSD: Tackling the Challenge, How to Make Informed Choices on Forest Product?
- The National New-Type Urbanization Plan Released, Board Members of CBCSD Help the Sustainable Development of Cities
- Board members of CBCSD Actively Participated in the Carbon Trading and International Climate Change Process
- Two industrial Standards Compiled by CBCSD Passed Examination
- Widespread Use of the Achievements Businesses Energy Saving and Greenhouse Gas Management
- CBCSD held Chemical industry enterprise value chain (range 3) greenhouse gas emissions, accounting and reporting guidelines