Current Location:Home->Newsroom->CBCSD Member News
CIMC Raffles Won The Bidding of 300ft Sinopec Jackup Drilling Rig

    On 23rd Dec. 2014, CIMC Raffles won the bidding of 300ft Sinopec jackup drilling rig, which will be operated by Shengli Petroleum Engineering Co. Sinopec Shengli Petroleum Engineering Co., Ltd after the delivery. With the working depth of 91.4m, designed temperature of -15℃, drilling depth of 9,144m and accommodation for 120 personnel, the rig can be operated in the deep range of 15-91.4 meter global sea areas. Self-designed by Shengli Drilling Technology Research Institute of Sinopec, the rig is classed by CCS. The self-research and design get fully supports from the Shandong Government. Friendly-operation and high-effective construction is adequately considered in the rig design. Concurrently, breakthroughs are made in the core equipment and materials, with a localization rate of 70%.

    It is the second offshore project cooperated between CIMC Raffles and Sinopec after their strategic cooperation agreement signed in 2012. On 21st Jun. 2014, their first cooperation project “New Shengli No.1” began into operation in Bohai Bay. Having drilled 7 wells, completed 6 wells, with the total drilling depth of 15,264 meters, we received a Thanks Letter from Shengli Petroleum Engineering Co. Sinopec Shengli Petroleum Engineering Co., Ltd. It is said, “The rig is in good condition with all equipment working well. In the 6-month production period, there is no breakdown due to equipment or system design errors. ”